Know your peak before it hits.
The peak, its risk and when to act, for utilities and data centers, from your data in 30 minutes.
24-hour load forecast
Peak load
812MW
P95 861 MW
Risk score
0.74
of 1.00
Cost impact
$184K
demand-charge exposure
Action window
15:30-17:15
before peak

Point Rassket at your data. Your control room gets the forecast, and the reasons behind it, in plain English.
The thirty-second version.
Every gigawatt starts as a guess.
Utilities have to decide which requests are real years before they arrive. Data centers have to know what they will pull before they ask. Both start from a forecast.
Know what your campus will pull, hour by hour.
Rassket turns your meter, sensor and telemetry data into the peak, what it costs at your tariff and when to act.
- Peak and cost exposure
- The hour your campus peaks, what that hour costs, and the window to shift or curtail before it.
- Any site, before you file
- Forecast a site from a lat,long and public data alone, before the interconnection request goes in.
- Paid from savings
- Shadow mode measures the difference on your own load. You pay about 10% of the savings it verifies.
123MUS buildings behind the Oak Ridge National Laboratory building-physics priors every forecast is trained with.
Built for the people who answer for the peak: utility control rooms, independent power producers and data center operators.
- Shadow mode, 6.9% baseline
- 3.1%
- day-ahead error (MAPE), less than half the incumbent
- Public data only
- 29.2s
- to forecast a 348,660-customer territory
- Middle Tennessee Electric
- ~2.45GW
- of load forecast live in production
- Against one to four weeks
- 30min
- from raw data to an operator decision
Programs, partners and sponsors along the way
- Founders, Inc.
Every signal in. Every decision out.
Connect live data from across your operation, let AutoML do the modeling, and get forecasts, insights, and answers your team can act on.

Grid and operations
- SCADA
- AMI meters
- Sensors
- Historians
Databases
PostgreSQL
MySQL
InfluxDB
MongoDB
Prometheus
Market context
- Weather
- Tariffs
- Prices
- Calendars
Ingest
Connect and clean live data
Train
AutoML with time-aware validation
Forecast
Predict, explain and monitor
Demand forecasts
Demand curves with P50 and P95 bands.
Grid and risk insights
Peak, risk score, cost impact and the window to intervene.
Plain-English answers
Ask questions of your data. No SQL, no dashboards to build.
Drift and alerts
Rassket flags model drift and retrains the moment accuracy slips.
Pricing that scales with the value you capture
Start free in shadow mode. You pay once Rassket has proven measurable savings on your own data.
Pilot
Prove the value on your own data, risk-free.
then 10% of verified savings
- Up to 10 projects
- 25 model trainings a month
- AI insights and plain-English results
- PDF and CSV export
- Email support
Enterprise
RecommendedLive pipelines and real-time forecasting for production teams.
per year, billed annually
- Unlimited projects
- Live data connectors
- Real-time predictions and drift detection
- Team collaboration and sharing
- Priority support
Gain-share
For large deployments. We win when your forecasts do.
of verified cost reductions
- Everything in Enterprise
- Custom data integrations
- Dedicated live pipeline support
- Dedicated solutions engineer
- 90-day performance guarantee
Every plan includes encryption in transit and at rest. Your data is never shared or sold.
Before your first forecast
Energy-native AutoML for utilities and data centers. Connect your load data and Rassket builds the forecasting models, tests them, runs them, and explains them in plain English. You own the models.
Both, from the same forecast. Utilities use it for the day-ahead peak and to see what a new large load does to it. Data center operators use it for their campus peak, its cost at their tariff, and to forecast a site before they file for interconnection.
No. AutoML does the modeling with time-aware validation, and Rassket flags model drift and retrains the moment accuracy slips.
Grid and operations data (SCADA, AMI meters, sensors, historians), databases (PostgreSQL, MySQL, InfluxDB, MongoDB, Prometheus), and market context such as weather, tariffs, prices and calendars. You can also start from a CSV.
Seconds, from public data alone: Middle Tennessee Electric took 29.2. On your own data, 30 minutes from raw data to an operator decision.
Shadow mode. Rassket runs 30 to 60 days beside your current forecast, on your own data, and reports the exact dollar difference before anyone switches. In shadow mode it has held 3.1% day-ahead MAPE against a 6.9% customer baseline.
Start free in shadow mode on the Pilot plan. You pay once Rassket has proven measurable savings on your own data. Enterprise and Gain-share terms are in the pricing table above.
Every plan includes encryption in transit and at rest. Your data is never shared or sold.
Your forecast, before our first call.
Name a utility, a ZIP code or a site. Rassket builds its forecast from public data, with no upload and no security review.

